Pillar: Hazards and constraints

How do you check asbestos, radon and contaminated land before buying?

Risks and checks·19 min read·Updated 30 October 2026
Map from the sample report: Slope of the ground. The average slope is 10% and the steepest 20%; the nearest ground steeper than 30% is 67 m away.Map legend: Slope of the ground
Map from page 58 of 116 of the TerrenoCheck sample report, a real plot (6633007BC5963S, Xàbia/Jávea (Alicante)): Slope of the ground. The average slope is 10% and the steepest 20%; the nearest ground steeper than 30% is 67 m away. Line source: IGN · terrain model. Aerial image: © Instituto Geográfico Nacional (PNOA), CC BY 4.0. See the report page
On this page

A rural property's roof, indoor air and former land uses need different checks. Get the records and agree access for inspections before paying a purchase deposit.

Have a specific plot in mind? The report gathers the public data and official maps for it, with source and date, for €29 VAT included. Pin it on the map →

The roof, the air in the house and the past uses of the land need separate checks, and none of them is settled by a map or by a nota simple with no warnings. This page explains what to ask the town hall about asbestos, what Catalonia requires since October 2026, how to read the radon zone in the Building Code, which measurement helps you decide and what Land Registry notes on contaminated soil mean, so it is settled before you pay a deposit (arras).

Where to start without ordering needless tests

Mark the house, the sheds and the land you are buying on a plan. Ask the seller what was there before, what materials were removed and whether there are buried tanks or environmental files. Ask for documents, not a general answer. If the plot sits on gypsum or limestone, check the risk of the ground sinking separately: see how to check for sinkholes and subsidence.

THREE CHECKS THAT DO NOT REPLACE EACH OTHERAsbestosInstalled materials or rubble: census, survey, certificateRadonNatural gas in indoor air: the town’s zone and a measurementSoilPast uses: soil status reports and Registry notes
A good result in one check settles neither of the other two. Sources: BOE, Law 7/2022, DA 14ª; Building Code, DB HS, section HS 6; BOE, Royal Decree 9/2005, article 3. Accessed 30 October 2026.

Asbestos can be in installed materials or in rubble. Radon is a natural radioactive gas that can build up inside a building. For the soil, you want to know whether there were activities able to contaminate it and what the authorities require. On an empty plot, focus on history and abandoned materials: the radon map helps the design, but it cannot certify the air of a house that does not exist yet. In a home, decide which rooms you will use and what works it needs.

What to ask about a roof that may contain asbestos

Ask the town hall for the census of installations and sites with asbestos and its removal timetable, giving the address and plot. The fourteenth additional provision of Law 7/2022 required these within a year of its entry into force and makes them public. If the office cannot find the property, ask whether it was inspected or simply not added.

Not being in the census does not replace a survey. The Ministry of Health guidelines separate finding suspect materials, identifying them and assessing their risk. Have the specialist also check downpipes, tanks and outbuildings, and mark the areas they could not reach.

Using and selling asbestos has been banned in Spain since 2002. That did not remove it from existing buildings: material installed before stays according to its service life and condition, not for a fixed period. Do not drill the roof, pressure-wash it or break off a sample yourself.

The 2028 date does not on its own require private roofs to come off. The law sets it for public installations and sites with the highest risk. On a private property, check the condition of the material, the municipal timetable and any measures that apply, without waiting for that date to assess damaged material. Source: BOE, Law 7/2022, DA 14ª. Accessed 30 October 2026.
What you findWhat it meansWhat it does not proveFirst step
Not in the municipal censusThe address is not listed.That the building has no asbestos.Ask whether it was inspected or simply not added.
Corrugated roof in a photoA material worth checking.Its composition or condition.Have a specialist survey it; do not take samples yourself.
Catalan certificateVisible asbestos, its condition and the risk (Law 8/2026, article 21.3).That there is no hidden material, or that it covers every annex.Check what units and buildings it covers.
Removal firm in the RERAThe firm is on the register of companies at asbestos risk.That the work plan for your job is approved.Ask for the approved plan for that job.
“It was already removed”A claim about past works.What material left or where it went.Ask for the work papers and the waste handover.

The census and the survey answer different questions. Sources: BOE, Law 7/2022, DA 14ª; BOE, Royal Decree 847/2026, articles 11, 12 and 18; BOE, Catalan Law 8/2026. Accessed 30 October 2026.

If you plan to remove a roof, ask the firm for its entry in the RERA, the register of companies working with asbestos, and the approved work plan for that job. Royal Decree 847/2026 requires materials to be identified before demolition or maintenance (article 10.2), a plan before each job with exposure risk (article 11) and its submission to the labour authority for approval (article 12). Being on the register (article 18) does not by itself show the plan was approved.

Taking the roof off and replacing it are separate costs. Ask for a quote that separates survey, access equipment, work plan, removal and waste handling, and another for the new roof. Before accepting that “it was already removed”, ask for the work papers and proof the waste went to a licensed handler. Source: BOE, Royal Decree 847/2026. Accessed 30 October 2026.

What changes in Catalonia from October 2026

Catalan Law 8/2026 came into force generally on 3 October 2026. Its article 21 requires a certificate of the presence or absence of asbestos to be handed over when a property is sold or let. The Catalan Waste Agency says it applies to buildings from before 2002 and offers a basic model while there are no regulations.

The certificate must at least cover visible asbestos, the condition of the materials and the risk to people. It does not show there is no hidden material. Architects, building engineers and engineers can issue it within their competence. If it covers one unit, it does not cover the others: check that it includes the house and the annexes you are buying.

Article 3 covers Catalan authorities, entities based or trading in Catalonia with property there, and people who live or work in Catalonia and own property there. If the seller lives elsewhere, ask the lawyer and the notary to check how the sale fits, without assuming an exemption. Article 11 also requires known asbestos to be reported to the authorities and steps taken to remove it; the seventh additional provision provides for its record in the Land Registry. Before buying, pin down the works, the timetable and who pays. Source: BOE, Catalan Law 8/2026. Accessed 30 October 2026.

How to look up the municipality’s radon zone

Open the current DB HS, go to section HS 6 and its appendix B. Find the province, then the municipality and the zone I or II column. Use the plot’s administrative municipality: a village or an urbanisation may go by another name. The classification is by municipality, not by region.

Spain’s nuclear safety council (CSN) publishes the radon potential map and the list of priority municipalities, which match zone II in appendix B. It warns that maps do not replace direct measurements. A municipality missing from the appendix is not a good measurement of the house either. Source: CSN, radon. Accessed 30 October 2026.

In listed municipalities, DB HS 6 applies to new buildings and certain works: extensions, in the new part; changes of use, in the building or the affected area; and renovations that can raise the protection or change the existing one, in the affected area. A sale on its own is not one of them. It does not apply to non-habitable rooms, which does not let you turn them into living space; if the purchase depends on that, also check what the planning rules let you build.

Radon: from municipality to designFirst: check the scope. Appendix B municipality and building. work covered by DB HS6. Select the route under the relevant rule. Default: municipality's zone I or II.. For work on existing buildings,. with appendix C annual averages. and a sampling zone above 300 Bq/m³:. Above 300 up to 600 Bq/m³: route I. Above 600 Bq/m³: route II. ZONE I ROUTE. Gas-protection barrier. or a ventilated air chamber. meeting DB HS6 conditions. USE THE APPLICABLE ROUTE. ZONE II ROUTE. Gas-protection barrier. PLUS one of these systems:. • ventilated containment space. • ground depressurisation. Equivalent or better protection allowed.. Existing buildings: justified. alternative solutions permitted.. Verify protection. Reference: 300 Bq/m³. Annual average in habitable rooms. The zone is not a test result for the home.Radon: from municipality to designFirst: check the scopeAppendix B municipality and buildingwork covered by DB HS6Select the route under the relevant ruleDefault: municipality's zone I or II.For work on existing buildings,with appendix C annual averagesand a sampling zone above 300 Bq/m³:Above 300 up to 600 Bq/m³: route IAbove 600 Bq/m³: route IIZONE I ROUTEGas-protection barrieror a ventilated air chambermeeting DB HS6 conditionsUSE THE APPLICABLE ROUTEZONE II ROUTEGas-protection barrierPLUS one of these systems:• ventilated containment space• ground depressurisationEquivalent or better protection allowed.Existing buildings: justifiedalternative solutions permitted.Verify protectionReference: 300 Bq/m³Annual average in habitable roomsThe zone is not a test result for the home.
DB HS 6 routes when the work falls within its scope. Measurements in existing buildings can decide the route. Equivalent or better solutions and justified alternatives are allowed. The diagram does not measure radon in any home. Source: Building Code, DB HS, section HS 6. Accessed 30 October 2026.

Zone I calls for a gas barrier or, as an alternative with its own conditions, a ventilated air chamber. Zone II combines the barrier with a ventilated containment space or with soil depressurisation. The seller saying the house “has a chamber” is not enough: the surveyor must check how it was built and ventilated. For works on existing buildings with annual averages measured under appendix C, values above 300 and up to 600 Bq/m³ take zone I solutions, and above 600 zone II (section 3.4). The designer justifies the route.

Which radon measurement helps you decide

The reference level is 300 Bq/m³ as an annual average in the air of habitable rooms. A short reading on a viewing is not that average. If you need to check the house, use a body accredited to measure radon in air and ask it to confirm compliance with appendix C. The professional chooses rooms and detectors, with attention to the lowest occupied floors, bedrooms and living rooms. For a home dug into the ground, see also what to check in a cave house.

PointWhat appendix C of DB HS 6 requiresWhat does not count
Measured annual average300 Bq/m³ is the reference level in the air of habitable rooms.A reading taken in the soil, or a guarantee below that value.
ExposureAt least two months of detector exposure, then analysis and an annual estimate.A short reading taken during a viewing.
DetectorsAt least two in a unit under 200 m² with a single sampling zone; with one or two in a zone, the highest result counts.Any detector placed anywhere.
Correction factor× 1.4 if an empty building could not be kept closed, or if a lived-in building in winter climate zones C, D or E was measured less than two thirds in the heating season.A free choice of the lab: the report should justify the rule used.

Ask for a report with a detector plan, dates, results and uncertainty. Source: Building Code, DB HS, section HS 6. Accessed 30 October 2026.

Appendix C requires at least two months of exposure. In a lived-in house normal habits continue; in an empty one, closed-building conditions are kept as far as possible, and any existing protection keeps running. Agree access and who looks after the detectors from the start. If the deposit date leaves no time for the result, move it or agree an express condition.

When a soil status report is needed

Look for a history of workshops, stored substances or waste handling. Annex I of Royal Decree 9/2005 lists potentially contaminating activities; a workshop is not classed by its sign alone. Stained earth, tanks or fill justify looking further, but do not prove a declared contamination.

Those running such activities must send the region a preliminary soil status report and then periodic reports, whose content and frequency the region sets; it can ask for further reports, data or analyses (Royal Decree 9/2005, article 3). Ask for copies, filing receipts and later requests.

The owner of land where a potentially contaminating activity took place must file a soil status report when applying for a licence for a different activity or a change of use (article 3.5). Buying is not on its own that case. If you want to turn a shed into a house, check the file before committing. A preliminary report is not a clean test: under annex II it requires no specific tests or analyses. Ask the environmental specialist whether the history is enough or samples are needed.

Registry notes and who pays for clean-up

The owner must state in the deed whether a potentially contaminating activity took place, and that statement is shown by a marginal note (Law 7/2022, article 98.3). The seller’s statement is not an analysis. Read the nota simple with this table in hand.

WHAT TO ASK FOR BEFORE THE DEPOSIT1 · Town hallAsbestos census and removal timetable for the address2 · SurveyorMaterials survey that flags areas it could not reach3 · LaboratoryRadon measurement under appendix C, if the house needs it4 · RegionSoil status reports, requests and decisions5 · RegistryNota simple and the decision behind each marginal note
Documents, not a general answer that “it has always been a farm”. Sources: BOE, Law 7/2022, article 98; BOE, Royal Decree 9/2005, article 8. Accessed 30 October 2026.
NoteWhat it meansWhat it does not proveFirst step
Statement on past activitiesThe owner declared in the deed whether a potentially contaminating activity took place (Law 7/2022, article 98.3).That the soil is contaminated, or that it is clean.Ask for the history and any soil status reports.
Start of proceedingsThe region opened a file; the note lapses after five years (Royal Decree 9/2005, article 8.2).The final outcome, or a clean-up when it lapses.Ask for the file and its current state.
Declaration of contaminated soilAn express decision of the region, with its boundary and conditions (Law 7/2022, article 99.1).Which uses will be allowed after clean-up.Read the decision; building rights may be suspended (article 99.4).
No note at allNothing was entered.That there was never a contaminating activity.Rebuild the past uses with the seller and the region.

A lapsed note does not show the land was cleaned. Sources: BOE, Law 7/2022, articles 98 and 99; BOE, Royal Decree 9/2005, article 8. Accessed 30 October 2026.

Before starting works in an area declared or marked out as contaminated, the developer must hold a Land Registry certificate showing the entry on the contamination (article 99.4); the purchase nota simple does not replace it. Cancelling the declaration note needs the region’s decision after checking the clean-up. It has six months from the filing of the report, and if that passes with no decision the request counts as refused (article 99.5): silence does not mean the land is clean.

Not having caused it does not remove liability. Article 100.1 makes those who caused the contamination liable first, jointly if there are several, and then, in second place, the owners and the occupiers. A buyer can be exposed as owner, and a clause making the seller pay does not change that order towards the authorities. Whoever pays in second place can claim from the polluter (article 100.2). Source: BOE, Law 7/2022, article 100. Accessed 30 October 2026.

The clean-up that can be required is limited to the use the land had when it was contaminated; improvements a new use needs fall on whoever promotes it (article 100.4). Do not accept “fit for industrial use” as proof that you can live there: compare the use the land was cleaned for with yours and budget for the rest.

Four hypothetical scenarios

These are invented examples to show the method, not real plots or readings from any map viewer.

Hypothetical example

1. A farmhouse with a corrugated roof on the barn

Imagine a farmhouse whose barn has a corrugated sheet roof. The town hall says the address is not in the census. That tells you nothing about the material. Order a survey before the deposit and get separate quotes for removal and a new roof if you plan to use the barn.

Hypothetical example

2. A basement you want to make a bedroom

Imagine a house in a zone II municipality with a basement you want to convert. The change of use falls under DB HS 6 and the design will have to justify the protection. Book the measurement early, as appendix C needs two months, and move the deposit date or agree a condition.

Hypothetical example

3. A workshop shed on the plot

Imagine a property with a shed that housed a car workshop and a nota simple with a statement on past activities. There is no declaration of contaminated soil. If you want to turn the shed into a home, you will need a soil status report when applying for the licence. Ask the region about the file before paying.

Hypothetical example

4. A lapsed start-of-proceedings note

Imagine the note opening a contaminated-soil procedure lapsed after five years. The seller says “there is nothing any more”. A lapsed note does not prove a clean-up. Ask for the decision and the state of the file.

When to hold the deposit

FIVE SIGNALS BEFORE YOU PAYStopYou may not inspect a suspect roof or measure the houseStopThere is a marginal note and no decision explaining itPausePromise to remove asbestos or clean soil with no scope or quoteConditionDeposit tied to survey, measurement and the region’s replyProceedClear documents and any pending measures costed
A red signal is a reason not to pay yet. It is not a technical conclusion. Sources: BOE, Law 7/2022, article 99; BOE, Law 7/2022, article 100. Accessed 30 October 2026.

The list does not replace a lawyer or a surveyor. It tells you whether you can pay now or whether a specific document is still missing.

What to write into the arras contract

In the arras contract, name the pending documents and the result that lets you go ahead. Agree in writing access to inspect and measure, who pays for the tests, what happens if they are late and how money is returned if the conditions fail. If the seller will remove asbestos or clean the land, say how completion will be checked and what financial guarantees they give. Do not assume you can withdraw at no cost.

Steps before the deposit

  1. Mark the house, annexes and suspect materials on a plan.
  2. Ask the town hall for the asbestos census and, in Catalonia, the seller for the certificate.
  3. Order an asbestos survey if there are suspect materials.
  4. Check the municipality’s zone in appendix B of DB HS 6 and whether your works fall within it.
  5. If you need to measure radon, agree access and the appendix C protocol early.
  6. Rebuild the past uses and ask the region for reports and decisions.
  7. Clear up every marginal note with the Registry and your lawyer.
  8. Only then set the price. A TerrenoCheck report gives the municipality’s radon zone, but it does not replace these tests or your lawyer.

Questions to send before you pay

  1. Are there asbestos materials in the house or annexes? Has a survey been done?
  2. Is the property in the municipal asbestos census and its timetable?
  3. In Catalonia, which asbestos certificate do you hand over and what does it cover?
  4. Has radon been measured? With what protocol, dates and results?
  5. What activities took place on the land before? Workshops, tanks or fill?
  6. Are there soil status reports or requests from the region?
  7. Which marginal notes are recorded and which decision do they refer to?
  8. Who pays for the tests and any pending measures?
  9. What happens to each payment if the results are not in by the agreed date?

Asbestos, radon and soil are checked with documents and measurements, not with the feel of a viewing. With the census, the measurement and the environmental file you will know what you are buying and what it costs to put right.

This guide is general information on the rules in force on the date each source was checked. It is not legal advice: for a specific purchase, ask a lawyer or the notary. Written and reviewed by the TerrenoCheck team (Kandyb Studio, Paweł Kandybowicz, responsible for the content). If you find a mistake, write to us and we will correct it.

Common questions

If the property is not in the asbestos census, is it asbestos-free?

No. Ask whether it was inspected and how far. The census and timetable are public, but not appearing in them does not replace identifying materials in the house and its annexes.

Must every private roof be removed before 2028?

The fourteenth additional provision sets no such general deadline: it refers to public installations and sites with the highest risk. A private roof needs its condition, the applicable measures and planned works checked, without waiting for that date to assess damaged material.

Does zone II under DB HS 6 mean you cannot live there?

No. It is a municipal classification for applying protection to works under DB HS 6. To know the level in an existing house you need a measurement; for works, the technical justification that applies.

Does a preliminary soil status report prove the soil is clean?

No. It can be written without specific tests or analyses. Check its content, the region’s replies and whether further investigation was required. What was enough for a past use may not be enough for the home you plan.

Can I buy if the seller agrees to pay for pending measures?

First cost the measures and check they are feasible. The contract must define them and secure their completion. The agreement does not remove the owner’s possible legal liability for the soil or replace the decisions required.

Does the report measure radon in the house?

No. It gives the municipality’s radon zone under DB HS 6 and the 300 Bq/m³ reference level. It has no indoor measurements, does not inspect asbestos and does not sample the soil.

Check this on your own plot

Pin the plot on the map and confirm the cadastral reference: the report gathers the public data and official maps for it, each with its source and date. It does not replace the land registry extract, the notary or a tax adviser. €29 VAT included.

Open the map Read a sample report