How do you check asbestos, radon and contaminated land before buying?


On this page
A rural property's roof, indoor air and former land uses need different checks. Get the records and agree access for inspections before paying a purchase deposit.
Have a specific plot in mind? The report gathers the public data and official maps for it, with source and date, for €29 VAT included. Pin it on the map →
The roof, the air in the house and the past uses of the land need separate checks, and none of them is settled by a map or by a nota simple with no warnings. This page explains what to ask the town hall about asbestos, what Catalonia requires since October 2026, how to read the radon zone in the Building Code, which measurement helps you decide and what Land Registry notes on contaminated soil mean, so it is settled before you pay a deposit (arras).
Where to start without ordering needless tests
Mark the house, the sheds and the land you are buying on a plan. Ask the seller what was there before, what materials were removed and whether there are buried tanks or environmental files. Ask for documents, not a general answer. If the plot sits on gypsum or limestone, check the risk of the ground sinking separately: see how to check for sinkholes and subsidence.
Asbestos can be in installed materials or in rubble. Radon is a natural radioactive gas that can build up inside a building. For the soil, you want to know whether there were activities able to contaminate it and what the authorities require. On an empty plot, focus on history and abandoned materials: the radon map helps the design, but it cannot certify the air of a house that does not exist yet. In a home, decide which rooms you will use and what works it needs.
What to ask about a roof that may contain asbestos
Ask the town hall for the census of installations and sites with asbestos and its removal timetable, giving the address and plot. The fourteenth additional provision of Law 7/2022 required these within a year of its entry into force and makes them public. If the office cannot find the property, ask whether it was inspected or simply not added.
Not being in the census does not replace a survey. The Ministry of Health guidelines separate finding suspect materials, identifying them and assessing their risk. Have the specialist also check downpipes, tanks and outbuildings, and mark the areas they could not reach.
Using and selling asbestos has been banned in Spain since 2002. That did not remove it from existing buildings: material installed before stays according to its service life and condition, not for a fixed period. Do not drill the roof, pressure-wash it or break off a sample yourself.
| What you find | What it means | What it does not prove | First step |
|---|---|---|---|
| Not in the municipal census | The address is not listed. | That the building has no asbestos. | Ask whether it was inspected or simply not added. |
| Corrugated roof in a photo | A material worth checking. | Its composition or condition. | Have a specialist survey it; do not take samples yourself. |
| Catalan certificate | Visible asbestos, its condition and the risk (Law 8/2026, article 21.3). | That there is no hidden material, or that it covers every annex. | Check what units and buildings it covers. |
| Removal firm in the RERA | The firm is on the register of companies at asbestos risk. | That the work plan for your job is approved. | Ask for the approved plan for that job. |
| “It was already removed” | A claim about past works. | What material left or where it went. | Ask for the work papers and the waste handover. |
The census and the survey answer different questions. Sources: BOE, Law 7/2022, DA 14ª; BOE, Royal Decree 847/2026, articles 11, 12 and 18; BOE, Catalan Law 8/2026. Accessed 30 October 2026.
If you plan to remove a roof, ask the firm for its entry in the RERA, the register of companies working with asbestos, and the approved work plan for that job. Royal Decree 847/2026 requires materials to be identified before demolition or maintenance (article 10.2), a plan before each job with exposure risk (article 11) and its submission to the labour authority for approval (article 12). Being on the register (article 18) does not by itself show the plan was approved.
What changes in Catalonia from October 2026
Catalan Law 8/2026 came into force generally on 3 October 2026. Its article 21 requires a certificate of the presence or absence of asbestos to be handed over when a property is sold or let. The Catalan Waste Agency says it applies to buildings from before 2002 and offers a basic model while there are no regulations.
The certificate must at least cover visible asbestos, the condition of the materials and the risk to people. It does not show there is no hidden material. Architects, building engineers and engineers can issue it within their competence. If it covers one unit, it does not cover the others: check that it includes the house and the annexes you are buying.
Article 3 covers Catalan authorities, entities based or trading in Catalonia with property there, and people who live or work in Catalonia and own property there. If the seller lives elsewhere, ask the lawyer and the notary to check how the sale fits, without assuming an exemption. Article 11 also requires known asbestos to be reported to the authorities and steps taken to remove it; the seventh additional provision provides for its record in the Land Registry. Before buying, pin down the works, the timetable and who pays. Source: BOE, Catalan Law 8/2026. Accessed 30 October 2026.
How to look up the municipality’s radon zone
Open the current DB HS, go to section HS 6 and its appendix B. Find the province, then the municipality and the zone I or II column. Use the plot’s administrative municipality: a village or an urbanisation may go by another name. The classification is by municipality, not by region.
Spain’s nuclear safety council (CSN) publishes the radon potential map and the list of priority municipalities, which match zone II in appendix B. It warns that maps do not replace direct measurements. A municipality missing from the appendix is not a good measurement of the house either. Source: CSN, radon. Accessed 30 October 2026.
In listed municipalities, DB HS 6 applies to new buildings and certain works: extensions, in the new part; changes of use, in the building or the affected area; and renovations that can raise the protection or change the existing one, in the affected area. A sale on its own is not one of them. It does not apply to non-habitable rooms, which does not let you turn them into living space; if the purchase depends on that, also check what the planning rules let you build.
Zone I calls for a gas barrier or, as an alternative with its own conditions, a ventilated air chamber. Zone II combines the barrier with a ventilated containment space or with soil depressurisation. The seller saying the house “has a chamber” is not enough: the surveyor must check how it was built and ventilated. For works on existing buildings with annual averages measured under appendix C, values above 300 and up to 600 Bq/m³ take zone I solutions, and above 600 zone II (section 3.4). The designer justifies the route.
Which radon measurement helps you decide
The reference level is 300 Bq/m³ as an annual average in the air of habitable rooms. A short reading on a viewing is not that average. If you need to check the house, use a body accredited to measure radon in air and ask it to confirm compliance with appendix C. The professional chooses rooms and detectors, with attention to the lowest occupied floors, bedrooms and living rooms. For a home dug into the ground, see also what to check in a cave house.
| Point | What appendix C of DB HS 6 requires | What does not count |
|---|---|---|
| Measured annual average | 300 Bq/m³ is the reference level in the air of habitable rooms. | A reading taken in the soil, or a guarantee below that value. |
| Exposure | At least two months of detector exposure, then analysis and an annual estimate. | A short reading taken during a viewing. |
| Detectors | At least two in a unit under 200 m² with a single sampling zone; with one or two in a zone, the highest result counts. | Any detector placed anywhere. |
| Correction factor | × 1.4 if an empty building could not be kept closed, or if a lived-in building in winter climate zones C, D or E was measured less than two thirds in the heating season. | A free choice of the lab: the report should justify the rule used. |
Ask for a report with a detector plan, dates, results and uncertainty. Source: Building Code, DB HS, section HS 6. Accessed 30 October 2026.
Appendix C requires at least two months of exposure. In a lived-in house normal habits continue; in an empty one, closed-building conditions are kept as far as possible, and any existing protection keeps running. Agree access and who looks after the detectors from the start. If the deposit date leaves no time for the result, move it or agree an express condition.
When a soil status report is needed
Look for a history of workshops, stored substances or waste handling. Annex I of Royal Decree 9/2005 lists potentially contaminating activities; a workshop is not classed by its sign alone. Stained earth, tanks or fill justify looking further, but do not prove a declared contamination.
Those running such activities must send the region a preliminary soil status report and then periodic reports, whose content and frequency the region sets; it can ask for further reports, data or analyses (Royal Decree 9/2005, article 3). Ask for copies, filing receipts and later requests.
The owner of land where a potentially contaminating activity took place must file a soil status report when applying for a licence for a different activity or a change of use (article 3.5). Buying is not on its own that case. If you want to turn a shed into a house, check the file before committing. A preliminary report is not a clean test: under annex II it requires no specific tests or analyses. Ask the environmental specialist whether the history is enough or samples are needed.
Registry notes and who pays for clean-up
The owner must state in the deed whether a potentially contaminating activity took place, and that statement is shown by a marginal note (Law 7/2022, article 98.3). The seller’s statement is not an analysis. Read the nota simple with this table in hand.
| Note | What it means | What it does not prove | First step |
|---|---|---|---|
| Statement on past activities | The owner declared in the deed whether a potentially contaminating activity took place (Law 7/2022, article 98.3). | That the soil is contaminated, or that it is clean. | Ask for the history and any soil status reports. |
| Start of proceedings | The region opened a file; the note lapses after five years (Royal Decree 9/2005, article 8.2). | The final outcome, or a clean-up when it lapses. | Ask for the file and its current state. |
| Declaration of contaminated soil | An express decision of the region, with its boundary and conditions (Law 7/2022, article 99.1). | Which uses will be allowed after clean-up. | Read the decision; building rights may be suspended (article 99.4). |
| No note at all | Nothing was entered. | That there was never a contaminating activity. | Rebuild the past uses with the seller and the region. |
A lapsed note does not show the land was cleaned. Sources: BOE, Law 7/2022, articles 98 and 99; BOE, Royal Decree 9/2005, article 8. Accessed 30 October 2026.
Before starting works in an area declared or marked out as contaminated, the developer must hold a Land Registry certificate showing the entry on the contamination (article 99.4); the purchase nota simple does not replace it. Cancelling the declaration note needs the region’s decision after checking the clean-up. It has six months from the filing of the report, and if that passes with no decision the request counts as refused (article 99.5): silence does not mean the land is clean.
The clean-up that can be required is limited to the use the land had when it was contaminated; improvements a new use needs fall on whoever promotes it (article 100.4). Do not accept “fit for industrial use” as proof that you can live there: compare the use the land was cleaned for with yours and budget for the rest.
Four hypothetical scenarios
These are invented examples to show the method, not real plots or readings from any map viewer.
1. A farmhouse with a corrugated roof on the barn
Imagine a farmhouse whose barn has a corrugated sheet roof. The town hall says the address is not in the census. That tells you nothing about the material. Order a survey before the deposit and get separate quotes for removal and a new roof if you plan to use the barn.
2. A basement you want to make a bedroom
Imagine a house in a zone II municipality with a basement you want to convert. The change of use falls under DB HS 6 and the design will have to justify the protection. Book the measurement early, as appendix C needs two months, and move the deposit date or agree a condition.
3. A workshop shed on the plot
Imagine a property with a shed that housed a car workshop and a nota simple with a statement on past activities. There is no declaration of contaminated soil. If you want to turn the shed into a home, you will need a soil status report when applying for the licence. Ask the region about the file before paying.
4. A lapsed start-of-proceedings note
Imagine the note opening a contaminated-soil procedure lapsed after five years. The seller says “there is nothing any more”. A lapsed note does not prove a clean-up. Ask for the decision and the state of the file.
When to hold the deposit
The list does not replace a lawyer or a surveyor. It tells you whether you can pay now or whether a specific document is still missing.
What to write into the arras contract
In the arras contract, name the pending documents and the result that lets you go ahead. Agree in writing access to inspect and measure, who pays for the tests, what happens if they are late and how money is returned if the conditions fail. If the seller will remove asbestos or clean the land, say how completion will be checked and what financial guarantees they give. Do not assume you can withdraw at no cost.
Steps before the deposit
- Mark the house, annexes and suspect materials on a plan.
- Ask the town hall for the asbestos census and, in Catalonia, the seller for the certificate.
- Order an asbestos survey if there are suspect materials.
- Check the municipality’s zone in appendix B of DB HS 6 and whether your works fall within it.
- If you need to measure radon, agree access and the appendix C protocol early.
- Rebuild the past uses and ask the region for reports and decisions.
- Clear up every marginal note with the Registry and your lawyer.
- Only then set the price. A TerrenoCheck report gives the municipality’s radon zone, but it does not replace these tests or your lawyer.
Questions to send before you pay
- Are there asbestos materials in the house or annexes? Has a survey been done?
- Is the property in the municipal asbestos census and its timetable?
- In Catalonia, which asbestos certificate do you hand over and what does it cover?
- Has radon been measured? With what protocol, dates and results?
- What activities took place on the land before? Workshops, tanks or fill?
- Are there soil status reports or requests from the region?
- Which marginal notes are recorded and which decision do they refer to?
- Who pays for the tests and any pending measures?
- What happens to each payment if the results are not in by the agreed date?
Asbestos, radon and soil are checked with documents and measurements, not with the feel of a viewing. With the census, the measurement and the environmental file you will know what you are buying and what it costs to put right.
Common questions
If the property is not in the asbestos census, is it asbestos-free?
No. Ask whether it was inspected and how far. The census and timetable are public, but not appearing in them does not replace identifying materials in the house and its annexes.
Must every private roof be removed before 2028?
The fourteenth additional provision sets no such general deadline: it refers to public installations and sites with the highest risk. A private roof needs its condition, the applicable measures and planned works checked, without waiting for that date to assess damaged material.
Does zone II under DB HS 6 mean you cannot live there?
No. It is a municipal classification for applying protection to works under DB HS 6. To know the level in an existing house you need a measurement; for works, the technical justification that applies.
Does a preliminary soil status report prove the soil is clean?
No. It can be written without specific tests or analyses. Check its content, the region’s replies and whether further investigation was required. What was enough for a past use may not be enough for the home you plan.
Can I buy if the seller agrees to pay for pending measures?
First cost the measures and check they are feasible. The contract must define them and secure their completion. The agreement does not remove the owner’s possible legal liability for the soil or replace the decisions required.
Does the report measure radon in the house?
No. It gives the municipality’s radon zone under DB HS 6 and the 300 Bq/m³ reference level. It has no indoor measurements, does not inspect asbestos and does not sample the soil.