Pillar: Hazards and constraints
How does seismic risk affect buying or renovating a house in Spain?


On this page
Check the municipality's NCSE-02 acceleration, then have the house and proposed works assessed. A map value cannot tell you whether a house is safe or what strengthening will cost.
Have a specific plot in mind? The report gathers the public data and official maps for it, with source and date, for €29 VAT included. Pin it on the map →
You can buy a house in an earthquake zone, but the map alone is not enough to decide. Spain’s seismic building code, the NCSE-02, gives each municipality a basic acceleration; that figure does not say what strengthening the house will cost, or prove that it is safe. The cost depends on the ground, the structure and the works, and the code sets no surcharge by location. This page sets out what to check, in order, before you pay a reservation fee or a deposit (arras): the value for the exact municipality, whether the code applies to your house and your works, which assessment to commission, how to budget and what insurance covers.
For a hillside plot, also prepare the separate landslide assessment. On gypsum or limestone ground, also check the sinkhole and subsidence risk.
First: which figure are you looking at?
“Low seismic zone” or “0.14 g” are listing phrases, not a diagnosis. They may refer to the NCSE-02 basic acceleration, to a project’s design acceleration, to a value from another map or to the intensity of a past earthquake. Each leads to a different question.
| Figure | What it means | What it does not prove | First step |
|---|---|---|---|
| Basic acceleration ab (NCSE-02 annex 1) | Horizontal ground acceleration for the municipality, as a share of gravity g. | Not the magnitude of an earthquake, nor the chance the house collapses. | Find the exact municipality in annex 1 and note ab and K. |
| Contribution coefficient K | A value that shapes the response spectrum, how response varies with vibration period. | It is not another multiplier in the ac formula. | Ask the designer how the spectrum was built. |
| Design acceleration ac | ab multiplied by the ground factor S and the risk factor ρ. | It cannot be worked out from the map: it needs the ground type and the building’s importance. | Geotechnical information and the building’s use. |
| PGA on the IGN 2016 viewer | An interpolated value for a point, 475-year return period, Eurocode 8 national annex. | It is not the NCSE-02 municipal ab and should not be copied into an NCSE calculation without justification. | Ask which map and which parameter each report uses. |
| No entry in annex 1 | ab below 0.04 g: the annex lists only values of 0.04 g or more. | It does not mean the building is earthquake-proof. | Ask the técnico to check the map and the criterion applied. |
Each figure leads to a different question. Sources: BOE, NCSE-02, section 2.1–2.3; IGN, 2016 seismic hazard map. Accessed 30 October 2026.
Where to look up the value for the municipality
Start with the exact municipality (término municipal). A listing that places the house “near Granada” or “on the Málaga coast” does not identify the value that applies. The NCSE-02, approved by Royal Decree 997/2002, is the State seismic building code in force for buildings; you can open it from the IGN’s index of seismic codes or in the BOE.
- Open the official text and look at figure 2.1, the seismic hazard map (Mapa de Peligrosidad Sísmica). It places the area within Spain as a whole.
- Then find the municipality in annex 1, ordered by region and province. Note the basic acceleration, ab, and the coefficient K. The annex lists municipalities with ab of 0.04 g or more.
- Give your architect the cadastral reference, where the building stands and what you want to do: keep it as it is, extend, replace the roof or open up rooms.
- Ask the designer to name the source used and justify how it leads to the design actions in your project. Keep the page you consulted with the rest of the file.
The map shows the hazard of the ground. It says nothing about the walls of a house and does not predict when an earthquake will come. Nor does it grant permission to build: check separately what the town plan allows.
What does an acceleration of 0.14 g mean?
The basic seismic acceleration describes the horizontal acceleration of the ground surface as a share of gravity, g. It is not the magnitude of an earthquake, nor the chance that a home collapses.
The design acceleration, ac, is the product ac = S × ρ × ab (section 2.2). S is the ground amplification factor; ρ (rho) is the risk factor, 1.0 for buildings of normal importance and 1.3 for those of special importance. K enters the response spectrum, not this formula.
That is why comparing two listings by their ab is not enough. The code distinguishes four ground types, from compact rock (type I) to loose granular or soft cohesive soil (type IV), and the type changes S. Classifying the ground needs geotechnical information, not a look at the garden. The ground factor does not on its own deal with a slope, fill or soil that could liquefy either: ask the técnico whether those questions are covered or need further investigation.
Source: BOE, NCSE-02, section 2.2. Accessed 30 October 2026.
Values for Granada, Murcia, Alicante, Almería and Málaga
These are municipal examples from annex 1. They are not single values for their provinces, and they are not a safety rating for the homes on sale there.
| Municipality | Region | Basic acceleration ab |
|---|---|---|
| Granada | Andalusia | 0.23 g |
| Santa Fe | Andalusia | 0.24 g |
| Murcia | Region of Murcia | 0.15 g |
| Lorca | Region of Murcia | 0.12 g |
| Alicante/Alacant | Valencian Community | 0.14 g |
| Orihuela | Valencian Community | 0.16 g |
| Almería | Andalusia | 0.14 g |
| Roquetas de Mar | Andalusia | 0.13 g |
| Málaga | Andalusia | 0.11 g |
| Vélez-Málaga | Andalusia | 0.18 g |
Municipal values from annex 1; they are not provincial values. Source: BOE, NCSE-02, section annex 1. Accessed 30 October 2026.
For another municipality, find its own entry; do not use the provincial capital’s value or interpolate between these figures. The code is national and the map includes the islands. If your municipality is not in the annex, ask the técnico to check the map and the criterion that applies.
Can the IGN’s 2016 map be used?
The IGN also publishes a 2016 seismic hazard viewer for the Spanish national annex to UNE-EN 1998, linked to Eurocode 8. For a point on the map or a pair of coordinates it returns interpolated values of PGA (peak ground acceleration) and K for a 475-year return period.
It is a different tool from the NCSE-02 municipal annex. Do not copy its PGA into the ab box of an NCSE calculation without justification. The NCSE lets the designer or site director adopt different criteria, on their own responsibility, if the level of safety and service is not lowered and the project records it (section 1.2.1). If two reports give different figures, first ask for the name of the map and the parameter compared.
When does the NCSE-02 apply to a home?
The code classifies buildings by their use and the consequences of their destruction. An occupied home is usually of normal importance; being small or rural does not make it a building of moderate importance. Buildings of special importance include those listed as historic or artistic monuments or of cultural interest: if the house has heritage protection, residential use alone does not settle ρ.
| Situation | What applies | What to ask for |
|---|---|---|
| Building of moderate importance | The NCSE-02 does not apply (section 1.2.3). | Written justification: an occupied home is usually of normal importance, however small or rural. |
| Normal or special importance, ab below 0.04 g | The NCSE-02 does not apply. | The annex entry, or the técnico’s check of the map. |
| Normal importance, frames well braced in every direction, ab below 0.08 g | Exempt, except buildings over seven storeys where ac is 0.08 g or more. | Proof of the bracing: a concrete frame alone does not show it. |
| ab of 0.04 g or more | Possible earthquake effects on potentially unstable ground must be considered. | Ask whether slopes, fill or soils prone to liquefaction have been looked at. |
| Load-bearing brick or block walls, ab from 0.08 g to under 0.12 g | At most four storeys. | The structural system before planning an extra floor. |
| Load-bearing brick or block walls, ab of 0.12 g or more | At most two storeys. | The same check; this is not a general planning height limit. |
| Dry stone, adobe or rammed earth, where the norm applies | Not used in buildings of normal or special importance. | How the planned works deal with it, before you sign a refurbishment. |
| Building listed as a historic or cultural monument | Special importance: ρ = 1.3 (section 1.2.2). | Its protection category, read against section 1.2.2. |
The thresholds are strict: a value equal to the limit is not below it. Source: BOE, NCSE-02, section 1.2.2–1.2.3. Accessed 30 October 2026.
Section 1.3.1 requires a “Seismic actions” section in the report of every works project, and it is a condition for the professional stamp (visado) and the licence. An exemption from the calculation must be justified, not covered by leaving the section out. For an old project, check the code that applied at its date; do not simply insist it cite the NCSE-02.
Does buying an old house mean you must strengthen it?
A sale on its own does not oblige you to rebuild the house as if it were new. There is an owner’s duty to keep it in the legal conditions of safety (Land Law, article 15.1.b), and a transfer does not release the owner from planning duties: the buyer steps into them (article 27.1). Ask the town hall and the seller for any outstanding repair or safety orders and proof they were carried out. Source: BOE, Land Law, articles 15 and 27. Accessed 30 October 2026.
Annex D of the Basic Document on Structural Safety (DB-SE), part of the Technical Building Code (CTE), governs assessing existing buildings and warns against simply applying the design rules for new ones. Define the brief: documents, structural system, damage and planned works, and whether it includes seismic vulnerability. A visual inspection with no damage found is not enough on its own: the DB-SE itself warns that a qualitative assessment may be insufficient for extraordinary design situations (D.6.1.2). The report should separate what was checked from what is hidden and justify whether test openings, tests or calculations are needed.
The Building Book (Libro del Edificio), where one exists, gathers the project with its changes, the handover record, the parties involved and the use and maintenance instructions (LOE, article 7). If the project is missing, ask about the town hall archive and agree access with the seller. A photo does not explain a repaired crack: ask for the history, reports and invoices.
After a high-intensity earthquake, every building in areas with intensity VII or more on the EMS scale needs a report on its consequences and the measures required (NCSE-02, section 1.3.3). The técnico in charge of maintenance commissions it or, if there is none, the owner, from a competent professional. If the house was in such an area, ask for that report and proof of the repairs.
Opening walls, extending or changing the roof
In refurbishments, the NCSE is taken into account so that the elements affected end up safer than in their original design; if the structure changes substantially, for example by gutting the interior and keeping only the façade, the work is treated as a new building (section 1.2.1).
| Works | What it requires | Basis |
|---|---|---|
| Painting and new finishes | No structural intervention; ask the técnico to confirm none is hidden in the plan. | CTE, article 2.4 |
| Openings in load-bearing walls, removing partitions | The técnico must know each element’s role first: the NCSE weighs the distribution of stiffness, including walls and partitions. | NCSE-02, sections 4.2.3 and 4.2.4 |
| Refurbishment of the affected elements | The NCSE is taken into account so that those elements end up safer than in their original design. | NCSE-02, section 1.2.1 |
| Substantial change to the structure, such as gutting behind the façade | Treated as new building for NCSE purposes. | NCSE-02, section 1.2.1 |
| Any work on an existing building | CTE compliance justified in the project or a signed report; the project must say whether it touches the structure. | CTE, articles 2.3 and 2.4 |
| Change of characteristic use, such as a store into a home | Meets the CTE’s basic requirements and needs a project. | CTE, article 2.6; LOE, article 2.2.b |
| Full intervention on a listed building, or works on its protected parts | Needs a project. | LOE, article 2.2.c |
Painting is not the same as opening a wall: give the técnico the sketch before asking for a price. Sources: BOE, NCSE-02, section 1.2.1; BOE, Technical Building Code, part I; BOE, Building Act (LOE), article 2. Accessed 30 October 2026.
The CTE applies to works on existing buildings, and compliance is justified in the project or a signed technical report. Where applying it is not viable for technical, economic or planning reasons, or because of the building’s protection, the designer may come as close to it as possible, but must justify it: it is not an automatic waiver (CTE, article 2.3).
How much can the works cost?
The NCSE does not turn ab into euros or a percentage. Ask for a price for defined structural work, separate from finishes. For a new house, ask for line items for the ground study, the structural design, foundations and ties, load-bearing elements, any joints needed and site inspections. Not every plot needs special foundations.
For an existing house, separate the assessment from the works it recommends. The works estimate should list the openings needed to work, any temporary propping, the structural work and making good the finishes, with each exclusion in writing. If test openings are still pending, the estimate should say which part remains open.
The basic project (proyecto básico) is enough to apply for the licence but not to start building; the execution project (proyecto de ejecución) defines the whole work (CTE, article 6.1.3). When comparing quotes, check they cover the same work and scope, and ask who will deal with changes if the works uncover a different structure.
What insurance to check
Meeting the NCSE does not guarantee an earthquake will cause no damage. The Consorcio de Compensación de Seguros, Spain’s public backstop for extraordinary risks, covers earthquakes, but only for holders of a policy of the kinds listed in article 4 of RD 300/2004, with its surcharge and the premium paid.
Ask the insurer to confirm in writing the property and sums insured, how underinsurance is applied and when cover starts, including the seven-day waiting period on new policies (articles 5 and 8). Damage due to an inherent defect of the property or obvious lack of maintenance is excluded (article 6.c): the policy is no substitute for repairs. Insure building and contents from completion. If you will carry out works, ask expressly: construction and erection policies are outside the compulsory surcharge regime (article 4.1.a).
Source: BOE, extraordinary-risk insurance regulations (RD 300/2004). Accessed 30 October 2026.
Four hypothetical scenarios
These are invented examples to show the method, not real houses or results from any report.
1. An open-plan kitchen in a Granada flat
Imagine a 1970s flat in Granada, where ab is 0.23 g, and a buyer who wants to join kitchen and living room by removing a wall. Nobody knows whether the wall is load-bearing. Before the deposit, have a técnico look at the plans or open up the wall and say whether it is structural and what replacing it would cost. Without that answer, the refurbishment that justifies the price may not be possible.
2. A rammed-earth farmhouse to be fully rebuilt inside
Imagine a rammed-earth (tapial) farmhouse in a municipality with ab of 0.14 g. The project would gut the interior and keep only the façades: a substantial change, treated as a new building. As a home of normal importance, the code does not accept the rammed-earth structure, so a new structure will be needed. Price that structure before you agree a price.
3. An extra floor on a brick house
Imagine a two-storey house with load-bearing brick walls in a municipality with ab of 0.13 g. The listing promises “room for a third floor”. At 0.12 g or more, masonry buildings have at most two storeys. A third floor would need a different structural system, on top of whatever the town plan allows.
4. Two reports, two figures
Imagine one report gives 0.18 g and another 0.19 g for the same house. One uses the NCSE-02 municipal annex and the other the IGN’s 2016 map: different sources, not two measurements of the structure. Ask each author for the map and the parameter, and let the designer justify which one is used.
When to stop
The list does not replace your architect or your lawyer. It tells you whether you can pay now or which document is still missing.
What to write into the arras contract
Have your lawyer draft the condition. The parties may agree whatever conditions they see fit within the law (Civil Code, article 1255), as long as performance is not left to the will of only one of them (article 1256). Spell out access to the property, delivery of documents, the date of the technical review, which result or cost would let you withdraw, how the money is returned and who is answerable for sums paid to the agent or the seller.
Do not assume an unfavourable report triggers a refund unless a clause says so. With arras penitenciales, you can withdraw by losing the deposit, and the seller by repaying double (article 1454); other types of arras can bind you to complete. More in the guide to the arras contract. Source: BOE, Civil Code, articles 1255, 1256 and 1454. Accessed 30 October 2026.
The buyer’s sequence before the deposit
- Identify the exact municipality and note ab and K from annex 1, with the scope of the refurbishment you want. Give it to your architect, with a delivery date before the deposit.
- Commission an independent técnico to assess the house and its seismic vulnerability, with the report’s limits in writing.
- If ground data, test openings or tests are needed, get a separate quote and the seller’s permission for access.
- Confirm with the town hall, your lawyer and your architect that the works are feasible, any heritage protection, and any outstanding orders.
- Ask the designer and the builder to define the intervention and price it, with inclusions and exclusions.
- Have your lawyer settle the reservation or arras terms before any money is transferred.
- Ask the insurer or broker for cover for the purchase and the planned works, with the start date in writing.
- Only then compare the price with the total cost of purchase and works. A TerrenoCheck report organises the public ground data, but it does not replace these documents or your architect.
Questions to send before money moves
- In which municipality exactly does the house stand? What ab and K does annex 1 give?
- Which seismic code applied to the original project at its date?
- Is there a project, changes, a Building Book or a geotechnical study? Where are they?
- Which walls are load-bearing, and what is the structural system?
- Has the house had cracks, damage or repairs? With which reports and invoices?
- Are there outstanding repair or safety orders from the town hall?
- Does the building have any heritage protection?
- Which works would my intended use require, and what would they cost?
- What does the current policy cover, and from when would I be covered?
- What happens to each payment if the agreed technical review does not allow the purchase to go ahead?
The figure on the map is useful because it tells you what to ask next. Keep the municipality’s value, the technical report and the estimate together, and let your architect and your lawyer confirm whether the purchase you have in mind still makes sense.
Common questions
Does seismic risk stop building in Granada or Murcia?
The map value is not on its own a ban on building. The NCSE-02 technical conditions and the land-use limits must be met. Confirm the specific project is feasible before you buy the plot.
Does a licence prove a house is earthquake-safe?
A licence does not replace an assessment of its current condition. Ask for the project, its changes and the as-built documents; the técnico must compare them with what stands today and with later damage or alterations.
Must every house built before the NCSE-02 be strengthened?
A sale creates no such general duty, and age does not guarantee safety either. The assessment looks at the real building and the intended use; a refurbishment must improve the elements affected and, if it changes the structure substantially, is treated as a new building for these purposes.
Can I work out the extra cost from the basic acceleration?
No. The NCSE puts no price on those values. You need the ground, the structure and the intervention to get comparable quotes. Keep the assessment fee separate from the works defined afterwards.
Does the IGN’s 2016 viewer replace the NCSE-02 municipal annex?
Not simply because it is published. It is another map with other parameters. The designer must justify the criterion used and any alternative, without lowering the code’s level of safety and service.
Keep reading
Check this on your own plot
Pin the plot on the map and confirm the cadastral reference: the report gathers the public data and official maps for it, each with its source and date. It does not replace the land registry extract, the notary or a tax adviser. €29 VAT included.